Skip to content

保温隔热材料指南 (Insulation Materials Guide)

1. Why Insulation Matters in Renovation

Proper insulation reduces energy costs by 20–40%, improves thermal comfort, reduces condensation and mold risk, and provides acoustic benefits. In renovation projects, insulation upgrades are most cost-effective when walls, windows, or roofs are already being opened up.

Key Metrics

TermSymbolDefinitionUnit
Thermal Conductivityλ (lambda)Heat flow through 1m thickness per 1°C differenceW/(m·K) — lower is better
Thermal ResistanceR-valueThickness / conductivity; resistance to heat flowm²·K/W — higher is better
U-ValueUOverall heat transfer coefficient of an assemblyW/(m²·K) — lower is better
R-Value (US)R-USImperial resistanceft²·°F·h/BTU

Conversion

  • R-value (metric) = thickness (m) / λ
  • R-US ≈ R-metric × 5.678

2. Insulation Material Types

Material Comparison Table

MaterialChinese Nameλ (W/m·K)FormR-value per 50mmFire RatingCost (per m², 50mm)Best Use
Expanded Polystyrene (EPS)膨胀聚苯板 (EPS)0.032–0.038Rigid board~1.3–1.6B1 (flame-retardant)LowExterior wall insulation
Extruded Polystyrene (XPS)挤塑聚苯板 (XPS)0.028–0.034Rigid board~1.5–1.8B1/B2Low–MidFloor, roof, below-grade
Rock Wool / Mineral Wool岩棉板0.034–0.040Board or batt~1.25–1.47A (non-combustible)MidFire-rated walls, facades
Glass Wool玻璃棉0.032–0.044Roll / batt~1.1–1.56A (non-combustible)Low–MidCeiling, stud wall cavities
Polyurethane Foam (PUR/PIR)聚氨酯板0.022–0.028Rigid board / spray~1.8–2.3B1/B2HighRoof, thin-profile walls
Aerogel Blanket气凝胶毡0.014–0.020Flexible blanket~2.5–3.6AVery HighSpace-constrained retrofits
Phenolic Foam酚醛板0.018–0.025Rigid board~2.0–2.8B1HighFire-sensitive applications
Reflective Foil (Radiant Barrier)铝箔反射隔热膜N/A (reflective)Sheet / roll~0.3–0.8 (effective)VariesLowAttic / roof radiant barrier

3. Wall Insulation (墙体保温)

Exterior Wall Insulation (外保温)

The most effective approach — wraps the entire building envelope.

Common Systems

System TypeDescriptionThicknessTypical R-valueSuitable For
EIFS (External Insulation Finish System)Insulation board + adhesive + mesh + finish coat50–120mm1.5–4.0New construction, major renovation
Ventilated Facade (幕墙)Insulation + air gap + cladding panel60–150mm1.7–4.5Commercial, high-end residential
Insulating Render (保温砂浆)Lightweight insulating plaster20–40mm0.5–1.0Heritage buildings, thin-profile retrofit

EPS Board Installation Steps

  1. Clean and level wall surface
  2. Apply adhesive in dot-and-perimeter pattern (minimum 40% coverage)
  3. Press boards firmly, staggering joints in brick pattern
  4. Wait 24 hours for adhesive set
  5. Install mechanical anchors (6–8 per m², depending on height)
  6. Apply base coat with embedded fiberglass mesh
  7. Apply finish coat (textured render or paint)

EPS Board Installation Checklist

  • [ ] Surface must be dry, clean, and structurally sound
  • [ ] Boards must be cut tightly around openings (no gaps > 2mm)
  • [ ] Stagger vertical joints — never align joints at corners
  • [ ] Anchor spacing: 6 per m² below 20m height, 8+ above
  • [ ] Mesh overlap at joints: minimum 100mm
  • [ ] Temperature during installation: 5–35°C
  • [ ] Do NOT install in rain or on wet substrate

Interior Wall Insulation (内保温)

Used when exterior insulation is not possible (heritage buildings, apartments, space constraints).

MaterialRecommended ThicknessNotes
XPS board20–40mmThin profile, good performance
Aerogel blanket10–20mmPremium, space-saving
Phenolic board20–30mmFire-safe, thin
Insulating plaster15–30mmDIY-friendly, lower performance

Warning: Interior insulation creates a cold bridge at floor/ceiling junctions and can cause interstitial condensation. Always install a vapor barrier on the warm side (facing the room).


4. Window Insulation (窗户隔热)

Window U-Values by Configuration

Window TypeGlassFrameU-Value (W/m²·K)SHGC
Single glazedClear single paneAluminum (no thermal break)5.7–6.50.85
Double glazed5+12A+5 clearAluminum thermal break2.7–3.20.70
Double glazedLow-E + argonAluminum thermal break1.6–2.00.40
Triple glazedLow-E + argon x2PVC / wood0.8–1.20.35
Double glazedLow-E + warm edge spacerWood-clad aluminum1.1–1.40.38

Window Insulation Upgrade Checklist

  • [ ] Replace single-glazed windows minimum with double Low-E
  • [ ] Verify thermal break on all aluminum frames
  • [ ] Check weatherstripping condition; replace worn seals
  • [ ] Install window insulation film in winter (temporary)
  • [ ] Seal frame-to-wall gap with low-expansion PU foam
  • [ ] Apply silicone sealant on exterior perimeter
  • [ ] Consider insulated shutters or blinds for summer heat rejection
  • [ ] Verify spacer type: warm edge (thermoplastic) outperforms aluminum spacer

Glass Types Explained

Glass TypeDescriptionBenefit
Low-E (低辐射玻璃)Microscopically thin metallic coating reflects IRReduces heat transfer 30–50%
Tinted / ReflectiveAbsorbs or reflects solar radiationReduces solar heat gain
LaminatedTwo panes with PVB interlayerSafety + acoustic + UV protection
TemperedHeat-strengthenedSafety (shatters into small pieces)
Electrochromic / Smart GlassElectrically switchable tintDynamic solar control, expensive

5. Roof Insulation (屋顶保温)

Roof Insulation Methods

MethodDescriptionMaterialThicknessR-value Range
Above-deck (inverted)Insulation above structural deck, under waterproofingXPS board60–120mm1.8–3.6
Below-deck (warm roof)Insulation below deck, between raftersMineral wool, PIR board100–200mm2.5–7.0
Spray foamClosed-cell PU sprayed on undersidePU foam50–100mm1.8–3.6
Loose fill (attic)Blown cellulose or glass wool in attic spaceCellulose, glass wool150–300mm3.5–8.0
Reflective foilRadiant barrier under roof coveringMulti-layer foilN/A0.3–0.8 effective
Climate ZoneMinimum Roof R-value (metric)Equivalent Thickness (Mineral Wool)
Hot-humid (South China)2.0~70mm
Mixed / temperate (East China)3.0~100mm
Cold (North China)4.0~130mm
Severe cold (Northeast)5.0+~170mm+

Installation Checklist — Below-Deck Insulation

  • [ ] Ensure roof waterproofing is intact before insulating
  • [ ] Provide ventilation gap (50mm minimum) between insulation and roof deck
  • [ ] Install vapor barrier on warm side (ceiling side)
  • [ ] Do NOT compress batt insulation — it loses R-value
  • [ ] Seal all penetrations (wires, pipes, light fixtures) through the vapor barrier
  • [ ] Use fire-rated insulation (Class A) near chimneys or heat sources
  • [ ] Verify insulation does not block soffit/eave ventilation channels

6. Floor Heating Insulation (地暖保温层)

Floor Heating System Layers (bottom to top)

LayerMaterialThicknessPurpose
1. Structural slabConcrete100mm+Base structure
2. WaterproofingSBS membrane or coating2–3mmMoisture barrier (ground floor)
3. Insulation boardXPS or EPS20–30mmPrevent downward heat loss
4. Reflective filmAluminum foil0.2mmReflect heat upward
5. Wire meshSteel mesh2–3mmSupport and protect pipe
6. Heating pipePEX-a or PERT16–20mmHeat distribution
7. Backfill / screedConcrete or anhydrite40–50mm above pipeThermal mass and surface leveling
8. Floor finishTile, wood, etc.VariesFinal surface

Insulation Board Requirements

PropertyMinimum Requirement
Compressive strength≥ 150 kPa (for residential) / ≥ 250 kPa (commercial)
Thermal conductivity≤ 0.035 W/(m·K)
Water absorption≤ 1.5% by volume
Fire ratingB1 minimum
Thickness20mm minimum (ground floor: 30mm recommended)

Floor Heating Insulation Checklist

  • [ ] Ground floor: install waterproofing layer before insulation
  • [ ] Upper floors: 20mm XPS minimum; 30mm for better efficiency
  • [ ] Perimeter: install edge insulation strip (10–15mm) around all walls
  • [ ] Reflective film: seams overlapped and taped
  • [ ] Pipe spacing: 150–200mm (closer near exterior walls/windows)
  • [ ] Pressure test heating pipes before screed pour
  • [ ] Screed must cure 21 days before turning on heating
  • [ ] Gradual heat-up: increase temperature 5°C per day during first commissioning

7. Fire Safety Considerations

Insulation Material Fire Ratings

RatingDescriptionApproved Materials
A (Non-combustible)Will not burnRock wool, glass wool, aerogel
B1 (Flame-retardant)Difficult to ignite, self-extinguishingEPS B1, XPS B1, PIR
B2 (Combustible)Ignites but slow spreadEPS B2, PU foam
B3 (Flammable)No fire resistanceUnmodified polystyrene — banned in building

Fire Safety Rules

  • Buildings above 27m height: exterior insulation must be Class A
  • Buildings 24–27m: minimum Class B1 with fire barriers every 2 floors
  • Fire barriers: horizontal mineral wool bands at each floor level (300mm minimum height)
  • All insulation must be fully covered with fire-rated render or cladding
  • Never leave exposed foam insulation on any building interior

8. Condensation and Vapor Control

The Dew Point Rule

When warm, moist indoor air meets a cold surface, condensation occurs. Insulation changes the temperature profile within the wall, and the dew point may shift.

ScenarioRiskSolution
Interior insulation without vapor barrierHigh — condensation within wallInstall vapor barrier on warm side
Exterior insulationLow — structure stays warmNo vapor barrier needed typically
Roof insulation without ventilationHigh — condensation on underside of deckProvide ventilation gap or use vapor-open insulation
Ground floor without waterproofingModerate — rising damp through insulationSBS membrane under insulation

Vapor Barrier Installation Checklist

  • [ ] Use polyethylene sheet (0.2mm minimum) or vapor-retarding membrane
  • [ ] Overlap seams by 200mm; seal with vapor barrier tape
  • [ ] Seal around all penetrations (outlets, pipes)
  • [ ] Continuous — no gaps or tears
  • [ ] On warm side of insulation (room side for interior insulation)
  • [ ] Verify with blower door test if possible

9. Selection Guide by Renovation Scenario

ScenarioRecommended InsulationThicknessEstimated R-value
Exterior wall (new build)EPS board B180mm2.4
Exterior wall (retrofit)EPS board B1 or mineral wool60mm1.8
Interior wall (space-constrained)Aerogel blanket or phenolic board20mm0.8–1.0
Flat roofXPS inverted roof system100mm3.0
Pitched roof (between rafters)Mineral wool batts150mm4.0
Attic floorBlown cellulose200mm5.0
Floor heating (upper floor)XPS board20mm0.6
Floor heating (ground floor)XPS board + waterproofing30mm0.9
Window upgradeDouble Low-E + thermal break frameN/AU-value 1.6–2.0
Pipe insulation (hot water)Rubber foam tube20mm wallPrevents heat loss and condensation
Hot water tankPU foam or fiberglass wrap50mmReduces standby losses 50%+

10. Brand and Product Recommendations

BrandProduct RangeNotes
Knauf (可耐福)Glass wool, mineral wool, EIFSGlobal leader, full system
Rockwool (洛科威)Mineral wool boards and battsFire-safe, acoustic benefits
Owens CorningFiberglass, foam boardWide availability
BASFPIR/PUR boards, spray foamChemical manufacturer, high performance
Saint-Gobain (Isover)Glass wool, mineral woolEuropean quality
Local XPS manufacturersVariousVerify compressive strength and fire rating on test report

Purchasing Checklist

  • [ ] Request material test report (导热系数, 燃烧等级, 抗压强度)
  • [ ] Verify fire rating certificate from accredited lab
  • [ ] Check manufacturing date — aged EPS/XPS loses some performance
  • [ ] Buy from authorized distributor to avoid counterfeit products
  • [ ] For exterior systems, use complete system from one manufacturer (board + adhesive + mesh + render)
  • [ ] Retain all product documentation for building inspection records

Released under the MIT License.